Planning Engineer

Planning Engineer

SAP and Maintenance Planning Expert from GCC

Doha, קטר
פרילנסר
 צור קשר

אודותינו

With 12 years of experience as Maintenance and Planning Engineer i have developed my skills in SAP PM and SAP Mm, MS Project, Primavera , Gantt Chart and MS Excel to name a few.

שפות

אנגלית
שפת אם
אורדו
שפת אם
ערבית
רמת מתחילים

תחומי התמחות

מרצים ומדריכים

מרצים, מדריכי SAP
SAP PM and MM end user training

SAP

SAP MM - Materials Management
SAP PM - Plant Maintenance
Experienced Maintenance Planner

נסיון תעסוקתי

מרץ 2018 - היום

Planning Engineer

Ras Laffan Power Company , Doha, Qatar
  •  Developing Outage scope, plans and its monitoring
  •  Developing Manpower, Potable Equipments, Special tools, outsource jobs scopes and Material
  • requirements for each outage work order and follow up with procurement for timely availability
  • of all the required resources.
  •  Compiling Outage reports and organizing critique sessions to capture lesson learned.
  •  Develop Long Term Outage and Running Hours Plans.
  •  Representing Planning Team in daily Morning Meeting to discuss new defects work orders raised
  • since last morning meeting and plan accordingly.
  •  Develop and implement Work Order/Maintenance Planning process flows and implementing it
  • using CMMS for the first time since plant commissioned.
  •  Preparing and issuing Day and Week ahead plans to Maintenance Teams.
  •  Review, Restructure and update CMMS database for Preventive Maintenance Programs and
  • developing PM task lists for Mechanical, Electrical and I&C task lists for PMs.
  •  Equipment hierarchy designing and functional locations restructuring according to KKS/TAG
  • numbers and P&IDs for uploading in upcoming CMMS (SAP)
  •  Developing Material (BOM) and attaching it to equipments in CMMS with installed quantity of
  • each part number.
יוני 2015 - מרץ 2018

Scheduler

Marafiq , Yanbu, Saudi Arabia
  • Working as “Planning Engineer” for GasTurbines (9 units), HRSGs(5 Units), Diesel Generators, Hydrogen Generators & CCB
  •  Preparing Major Inspection, HGPI, CI & Annual Inspection Plans using MS Project, Creating overhauling work orders, preparing shutdown report etc.
  •  Preparing 5 years and 1 year Inspection plans for GTGs, STGs & Water Plants based on latest running hours and plant conditions on every December and get it approved by management
  •  Preparing scope of work for GTG inspections to be done by outside contractors.
  •  Representing Planning Team in “PDR” Plan Do Review meeting on daily basis with Operation to review new notifications created in last 24hours, review progress on ongoing activities and schedule breakers.
  •  Updating daily maintenance log in computerized data base.
  •  Validating Notifications from SAP for Mechanical/Electrical/I&C disciplines work centers,
  • creating work orders and assigning required resources by making frequent site visits, referring to P&IDs, Isometric Drawings & OEM Manuals, coordination with Operation Engineers, Maintenance Supervisors and all related interfaces.
  •  Scheduling PM and CM work orders once they are approved by superintendent.
  •  Preparing & issuing Weekly Maintenance Schedules.
  •  Participating in weekly planning meeting and presenting the lock schedule(next week schedule,
  • T-2(2 weeks look ahead & T-6(6 weeks look ahead)
  •  Analyzing SAP PM Plans discrepancies, duplication, bugs or errors and initiating corrective
  • actions.
  •  Keeping record of accomplishment and following up for all “backlog” work orders, which are
  • waiting for Material/Services/Engineering etc.
  •  Preparing & presenting Maintenance KPI in weekly Planning meeting.
ספטמבר 2012 - יוני 2015

Mechanical Planner

BOROUGE , Ruwais, United Arab Emirates
  • Working as Mechanical Planner (Daily & TA Maintenance)in Plant Availability Functionfor Polyethylene Plants.
  •  Leading the team of 3 Planners and Preparing Task Lists, Maintenance Plans in SAPfor upcoming Borouge 3 Project.
  •  Representing PE Planning Team in “Daily Production Meeting” and cascading actions to all concerned received during the meeting.
  •  Validating Work orders from SAP for Mechanical work centers and Participating in Daily Planning Meeting to decide next day jobs and Planning the Work Orders accordingly by using SAP PM Module.
  •  Planning all PM & CM work orders till RFE (ready for execution status) by making frequent site visits, Referring to drawings & 3D plant models for specifications, coordination with Production Engineers, Maintenance Supervisors/Engineers and all related interfaces.
  •  Analyzing SAP PM Plans Master Data of Mechanical Equipments for any discrepancies, duplication, bugs or errors and initiating corrective actions by calling meetings.
  •  Keeping track record and following up for all “backlog” work orders which are waiting for Material/Services/Engineering etc.
  •  Updating and creating Maintenance Plans in SAP for all Mechanical Equipments.
  •  Creating Purchase Order Description for spares
  •  Ensuring all KPI compliances for work orders including PM Plant compliance, Schedule
  • Attainment, Plan v/s Actual KPIs.
  •  Providing necessary assistance to Scheduler for issuing Daily & Weekly Schedules.
  •  Turnaround Excellence Award 2013 by Borouge for B2 Turnaround Excellent
  • Contribution

תארים אקדמיים

ינואר 2002 - נובמבר 2005

Bachelor of Engineering

University of Engineering and Technology Taxila
  • BSc Mechanical Engineering